ggCollider Workshop Meeting
        ===========================

        Fermilab
        20-Dec-2000

Workshop Plan
-------------
14-17 March, at Fermilab.
  14: plenaries
  15 & 16: half plenaries, half parallel
  17, morning: summaries (plenary)
  17, afternoon: discussion of Snowmass preparations

SLC as a gamma-gamma collider
-----------------------------
Michael explained his notion of looking for evidence of a Higgs
through interference with gauge diagrams gg --> bbbar.  However,
it is far from clear that any effect will be measureable.

Higgs factory
-------------
Jeff: Ecm(e+e-) = 200 GeV, low enough to produce Higgs (120 GeV)
at the peak in the photon cm energy spectrum, is a known option
for the NLC.  People have worked out possible machine parameters.

It may be possible to run a gamma-gamma collider concurrently
with the NLC in e+e- mode.

Machine Talks
-------------
Jeff will propose a "machine" section for the workshop.